Here you will have the possibility to read news and completions of the project. Do not hesitate to visit us regularly!

 

Today, at the Heinrich-Heine Gymnasium in Heikendorf – one of our pilot schools – practical exhibition construction was on the timetable: First, the content had to be distributed on the three shelves; this is easiest done with lots of chits and place. Which subject should be placed where? Which text tables belong to which exhibit? Will it be possible to see the exhibit in this comparment? A lot of questions, a lot of discussion, but at the end a solution that gives (almost) all a satisfying feeling. 

  

After making the electro-plan, the shelf is being built. It is not easy to build up a shelf with a size of almost 2 x 2 m. And the tasks will get more and more ambitious: cutting lots of small wooden logs, drilling Plexi boards as glass panels for the showcases, soldering cables at the LED-stripes, testing and assembling the U-profiles for the illumination. But at the end everything works perfect, the LEDs are shining and after one day of working the basis of the exhibition is practically ready.